These are representative profiles, not case studies of specific past jobs. The scope, sequence, timelines and cost bands are drawn from the Tucson market as of 2026 and from how we actually build. The photography is our own completed work.

We publish them because the useful information about a remodel is almost never in the finished photograph. It is in the order the work happens, what gets inspected before it is covered, and which decisions are irreversible once the concrete goes back down.

Profile 01

Guest bathroom, plumbing stays

The most common project we take on. Existing fixture locations kept, so no slab work. Tiled shower, stock or semi-custom vanity, new floor, quality fittings, proper exhaust ventilation and blocking behind the tile for future grab bars.

Typical band

Cost: $18,000 – $35,000
On site: 3 – 5 weeks

How it runs

  • Demolition to studs and slab, 2 days
  • Plumbing and electrical rough-in in existing locations, 2 days
  • Waterproofing, then a flood test held overnight
  • Tile set to a drawn layout, 4 to 6 days
  • Vanity, fittings, paint and trim
  • Glass templated after tile, fabricated in 1 to 2 weeks
Single vanity and oval mirror in a completed Tucson bathroom

Profile 02

Primary bathroom, curbless conversion

Converting a tub-and-shower primary into a curbless walk-in. On a slab this means either recessing the concrete or building the floor plane up, which is decided at design because it changes the threshold and the door swing into the room.

Typical band

Cost: $35,000 – $65,000
On site: 6 – 10 weeks

How it runs

  • Slab scan where the home is post-tension
  • Demolition and slab recess or floor build-up
  • Linear drain set and pan sloped, membrane turned up the walls
  • Flood test before any tile
  • Large-format tile, bench and niche set to the drawn layout
  • Frameless glass templated to the finished walls
Walk-through marble shower in a Tucson primary bathroom

Profile 03

Kitchen, same footprint

New semi-custom cabinetry, quartz or granite, new flooring and a full lighting redesign, with plumbing staying exactly where it is. The band most Tucson kitchens land in, and the best value per dollar in the whole category.

Typical band

Cost: $55,000 – $95,000
On site: 6 – 10 weeks on site

How it runs

  • Design and selections, 4 to 8 weeks before site work
  • Cabinetry ordered early, 8 to 16 week lead times are normal
  • Demolition and protection, 2 to 3 days
  • Electrical and lighting rough-in, panel work if needed
  • Cabinets set and scribed, then stone templated from the installed cabinets
  • Stone fabrication 1 to 2 weeks, then backsplash, fittings and trim
Contemporary kitchen remodel in Tucson with cabinetry in the original footprint

Profile 04

Kitchen, wall removed and island added

The full version. A wall comes out to open the kitchen into the living space, and the sink moves to a new island. Both of those are structural and concrete work respectively, which is where the money is.

Typical band

Cost: $95,000 – $175,000+
On site: 10 – 16 weeks on site

How it runs

  • Structural engineering for the opening, plus a slab scan
  • Beam, posts and footings for the wall removal
  • Saw-cut, excavate and re-route the drain, inspected before backfill
  • Slab re-pour and floor levelling
  • Custom cabinetry, stone, and full electrical redesign
  • Finishes, then a walkthrough punch list before the final invoice
Marble waterfall island in an opened-up Tucson kitchen

Profile 05

Detached casita, 650 sq ft

A one-bedroom casita with kitchen and bathroom, permitted by right in the City of Tucson under HB 2720. Most of the elapsed time is design, engineering and a 90 to 120 day ministerial review rather than construction.

Typical band

Cost: $110,000 – $190,000
On site: 12 – 18 months end to end

How it runs

  • Jurisdiction and HOA covenant check, first
  • Design, then permit submission
  • Ministerial review, commonly 90 to 120 days
  • Utility trenching and footings, where caliche shows up
  • Framing, roof and dry-in, scheduled around monsoon
  • MEP, finishes and certificate of occupancy
Detached casita construction in Tucson, Arizona

Profile 06

Backyard, shade first

An engineered ramada, paver patio with proper base and drainage, and a built-in outdoor kitchen underneath it. Built in that order deliberately: an outdoor kitchen with no shade over it goes unused from May to September.

Typical band

Cost: $35,000 – $90,000
On site: 5 – 9 weeks

How it runs

  • Sun study, wind exposure and where storm water currently goes
  • Permits for the structure, gas line and new circuits
  • Footings and utility trenching through caliche
  • Ramada engineered and footed for monsoon uplift
  • Paver base compacted in lifts, edge restraint, drainage away from the house
  • Kitchen, counters in granite or porcelain rather than quartz, and low-voltage lighting
Paver patio and covered porch in Dove Mountain, Marana

Go Deeper

Service pages and guides

Straight Answers

About these profiles

Are these specific past projects?

No, and we say so plainly. These are representative profiles of the project types we build most often, with scope, sequence, timelines and cost bands drawn from the Tucson market as of 2026.

The photography is our own completed work. The figures are ranges rather than quotes, published so you can sanity-check any estimate you receive from anyone.

How accurate are the timelines?

They reflect typical on-site duration for a project that has been properly designed and permitted before work starts.

The two things that most often extend a schedule are long-lead items, since custom cabinetry and windows can each run 8 to 16 weeks, and permit review time, which varies by jurisdiction. Both are handled up front so they overlap with other work rather than following it.

Can I see work in my neighbourhood?

Often, yes. We work across the whole metro, and for larger projects we can usually arrange a reference with a homeowner who had similar work done nearby, with their permission.

Read client reviews

Ends September 30 · left

Book a bathroom remodel this month,
choose an upgrade on us

Sign a full bathroom remodel by September 30 and pick one premium upgrade, included at no cost. Not a discount — an actual upgrade to the finished room, specified and installed as part of the build.

Frameless glass

Frameless Shower Enclosure

Custom-templated to your finished walls after tile. The single upgrade that most changes how a bathroom reads.

Underfoot

Heated Tile Floors

Electric in-floor heat under the tile, on its own thermostat. Impossible to retrofit later without pulling the floor up again.

Stone & storage

Upgraded Vanity & Stone

A step up in cabinetry and countertop material — the two things you touch every morning for the next fifteen years.

One upgrade per household, on full bathroom remodels signed by September 30, 2026. Upgrade is specified during design and installed with the project; it cannot be exchanged for a credit or discount. Consultations and written estimates are always free and carry no obligation.

Which one is your project?

Free consultation and a written estimate for your actual house, not a range.

Get My Free Consultation (520) 548-2125